Construction Rates 2026 — Per Square Foot

Honest, current per-square-foot construction rates for Islamabad — by area, by package, plus basement and swimming pool extensions. No guesswork, no hidden costs.

Rate by package (2026)

Construction is priced per square foot of covered area — the total built floor space across all storeys, not your plot size. Convert your plot with the kanal to marla converter.

Package2026 rateWhat's included
Grey structureRs 2,000 – 3,800 / sq ftFoundation, RCC frame, blockwork, plaster, conduiting
Turnkey (standard)Rs 5,000 – 6,500 / sq ftGrey structure + tiling, paint, woodwork, fixtures
Turnkey (premium)Rs 6,500 – 9,000+ / sq ftImported tiles, designer kitchen, premium fittings

Rates by area — Islamabad

This is where most quotes go wrong. A DHA or F-sector build is genuinely more expensive than the same house in B-17 or an airport-side society — access, soil, bylaws, finish expectations and labour all differ. These are our real 2026 working bands:

AreaGrey structureTurnkeyMarket
DHA IslamabadRs 2,500 – 3,700 / sq ftRs 6,000 – 8,800 / sq ftPremium
Islamabad F & E Sectors (F-6…F-11, E-7, E-11)Rs 2,600 – 3,800 / sq ftRs 6,200 – 9,000 / sq ftPremium+
Bahria Town Islamabad / Bahria EnclaveRs 2,300 – 3,300 / sq ftRs 5,600 – 8,200 / sq ftPremium
Gulberg Greens / Gulberg ResidenciaRs 2,300 – 3,300 / sq ftRs 5,600 – 8,200 / sq ftPremium
Park View City / Capital Smart CityRs 2,400 – 3,400 / sq ftRs 5,800 – 8,400 / sq ftPremium
Islamabad G & I Sectors (G-9…G-15, I-8)Rs 2,200 – 3,100 / sq ftRs 5,300 – 7,600 / sq ftStandard
D-12 / F-17 / Faisal Town / CBR TownRs 2,200 – 3,000 / sq ftRs 5,300 – 7,500 / sq ftStandard
B-17 / Top City / Mumtaz City / Ghauri TownRs 2,000 – 2,900 / sq ftRs 5,000 – 7,300 / sq ftValue

Building anywhere in Islamabad — DHA, Bahria Town, Gulberg or the F/E sectors? Send your plot size on WhatsApp and we'll confirm your exact rate today.

Extensions: basement, pool & more

These are never charged at your normal covered-area rate — anyone who quotes them that way is guessing. Each is priced on its own scope:

Extension2026 rateWhy it's priced separately
Basement (excavation, retaining walls, waterproofing)PKR 3,200 – 4,500 / sq ftCosts more than above-ground: shoring, dewatering, RCC retaining walls and multi-layer waterproofing.
Swimming pool (shell, filtration, tiling, lighting)PKR 4,500 – 7,000 / sq ft of poolA standard 20×10 ft pool ≈ 200 sq ft. Includes shell, plumbing, filtration plant, tiling and lights.
Architecture & 3D designPKR 150 – 250 / sq ft2D plans, 3D elevations, structural + MEP drawings.
Map / drawing approval supportFrom PKR 1.0 lakhDrawing set, submission and follow-up for CDA / RDA / DHA / cantonment.
Precast boundary wallPKR 550 – 900 / running ftDepends on wall height and panel specification.
Our cost calculator now includes basement and swimming pool as add-ons, so you can see the real total — not just the house.

DHA rate band across Pakistan (2026)

For reference, here is how DHA construction rates compare nationally in 2026. We build in DHA Islamabad; the rest is included so you can benchmark honestly.

DHA CityGrey structureTurnkeyMarket
DHA LahoreRs 2,200 – 3,200 / sq ftRs 5,500 – 8,500 / sq ftPremium
DHA KarachiRs 2,400 – 3,500 / sq ftRs 5,800 – 9,000 / sq ftPremium+
DHA Islamabad–RawalpindiRs 2,500 – 3,700 / sq ftRs 6,000 – 8,800 / sq ftPremium
DHA MultanRs 1,900 – 2,900 / sq ftRs 5,200 – 7,500 / sq ftStandard
DHA PeshawarRs 2,400 – 3,300 / sq ftRs 5,800 – 8,000 / sq ftStandard
DHA BahawalpurRs 1,900 – 2,600 / sq ftRs 5,000 – 7,200 / sq ftGrowing
DHA QuettaRs 2,800 – 3,500 / sq ftRs 6,000 – 8,500 / sq ftEmerging
DHA GujranwalaRs 2,000 – 2,800 / sq ftRs 5,200 – 7,500 / sq ftGrowing

What actually moves your rate

  • Steel & cement prices — the biggest swing factor; they move month to month.
  • Area & access — DHA/F-sector sites cost more than outer schemes.
  • Design complexity — basements, long spans, curved work and heavy elevations add cost.
  • Finish level — local vs imported tiles, standard vs designer kitchen, simple vs layered ceilings.
  • Covered area — bigger builds get slightly better per-foot efficiency.
  • Soil & water table — these decide your foundation and basement cost.

Read the full breakdown in our cost per square foot guide and grey structure cost guide.

How we quote: we fix your per-square-foot rate in the contract with an itemised BOQ. If steel moves mid-project, that's our risk to manage — not a surprise on your bill.
Rate FAQ

Construction rate questions

What is the construction rate per square foot in Pakistan in 2026?

In 2026, grey structure runs about Rs 2,000–3,800 per sq ft of covered area and turnkey (finished) about Rs 5,000–9,000 per sq ft. Your exact rate depends on the area — DHA Islamabad and the F/E sectors sit at the top of the band, B-17 and the airport-side societies at the bottom.

What is the construction rate in DHA Islamabad in 2026?

DHA Islamabad is a premium market: roughly Rs 2,500–3,700 per sq ft for grey structure and Rs 6,000–8,800 per sq ft for turnkey construction in 2026.

What are Bahria Town construction rates in 2026?

Bahria Town Islamabad and Bahria Enclave run approximately Rs 2,300–3,300 per sq ft for grey structure and Rs 5,600–8,200 per sq ft turnkey in 2026 — slightly below DHA.

What are Gulberg and Park View construction rates in 2026?

Gulberg Greens, Gulberg Residencia and Park View City run about Rs 2,300–3,400 per sq ft grey and Rs 5,600–8,400 turnkey in 2026 — premium societies just below DHA and the F/E sectors.

Does a basement cost the same per square foot as the house?

No. A basement costs more — about Rs 3,200–4,500 per sq ft — because it needs excavation, shoring, dewatering, RCC retaining walls and multi-layer waterproofing. It is always quoted separately from your covered-area rate.

How much does a swimming pool cost to build?

Roughly Rs 4,500–7,000 per sq ft of pool area, including the shell, plumbing, filtration plant, tiling and lighting. A standard 20×10 ft pool (about 200 sq ft) therefore lands near Rs 9–14 lakh.

Why do construction rates change during the year?

Steel and cement are the biggest inputs and their prices move monthly. That is why we fix your rate in the contract — so mid-project price movement does not become your problem.

Next step

Get your exact rate — free

Send us your plot size, area and whether you want grey structure or turnkey. You'll get an itemised, fixed-rate quote the same day.